Red Thunder - Campaign "Five Days One Summer" - Scenario "Mission 5B2 Re-open the route Part 2"
Author: George MCCreated with version:CMRT v2.10 to v2.13Requires module(s): Fire and Rubble, Battle Pack #1Uses mod tags:nogear

No picture provided!23rd July KG Kummel after tactical pause resumes attack on ZERCZYCE and STACJA-NURZEC at dawn with support from gepanzerte gruppe Westphal. 0430Hrs

Included with the campaign

Battle Type: Axis Attack Date: 1944/07/23
Time: Dawn 04:30 Length: 02:30
Size: Medium Terrain: Open
Map Size: w: 3008 m d: 4000 m Area: 12.032 Sq. km
Region: Eastern Europe Early Intel: Allied Force
Weather: Clear and Warm Ground Conditions: Dry
theBlitz Size Modifier: 7